EXPANSION 2 MAX

AGILE FAB REVAMP - FROM AN OLD WORKING FAB TO AN AGILE FAB

The process of expanding an existing facility, while following the same basic steps as a green-field design, is much more complex. In addition to the inherent challenges any design and construction project entails, the expansion is done in a living manufacturing facility. The challange is twofold, avoid disruption to production, and optimize the layout and repoition problematic tools that are still being usde by prodcution.

Complicated? Very!

Worth the effort? You can bet your future on it!

© 1999-2020 MAX I.E.G. All Rights Reserved